The renovation notes of the 40-year-old supervisor were quickly copied and copied, and the hydropower is no longer worried.

Renovation is not a small problem, sloppy. In the process of decoration, hydropower is a top priority. Many owners don't know much about this piece. Xiaobian this time sorts out the small knowledge about circuit construction quality and acceptance to the owners.

Electrical construction quality and acceptance criteria

First, electrical construction process requirements and standards:

1. Before installing complex circuits, a concise circuit diagram should be drawn up according to customer requirements, and the direction of the line should be indicated. After the project is finished, the concise road map should be submitted to the user for future maintenance.

2. All wires are not allowed to have joints in the wall, and the pipes (PVC pipes or snake skin pipes) are buried in the wall. The wire shall go in the wall, and the insulation of the wire shall not be damaged, and the short circuit or open circuit shall be avoided. Copper wire is strictly prohibited in the fuse box.

3. All wire boxes, switches, sockets and lamps must be installed firmly and correctly. The switch box must have a wired box inside the wall of the socket. Generally, the switch is about 1200mm from the ground, and the ground socket is about 300mm. The fire line must be switched on.

4. The power cable generally uses 2.5mm copper wire. Responsible for modifying the power switch, telephone socket, etc., but not responsible for TV video line modification. Should be revised by a professional.

5, the wire line laying must use PVC wire trough line pipe.

6. The electrician should install the lamps, switches and panels after other renovations are completed. Before this, after the circuit is inspected, the insulation tape should be used to complete the installation.

7. All electrician construction should comply with relevant state regulations.

Wiring diagram

VC line wiring should pay attention to the following provisions:

1. pipeline:

1 PVC pipe must be elasticized, slotted with a cutter, and the depth of the groove is 1-1.5 cm mortar protective layer.

2 If the PVC pipe floor is not slotted, firstly slide the ground straight line and fix the pipe along the ink line.

3 86 The distance between the cassettes should be between 0.8-1 cm. The kitchen and bathroom walls should be covered with brick thickness.

2. Pipeline link:

1 Special glue must be applied to the casing between the pipe and the pipe.

2 The tube and the cassette must be connected with the lock and the lock.

3 The mortar fill line should be watered first, then repaired with pure cement mortar, no higher than the original wall.

4 Do not use the three-way elbow. The splitter must use the splitter box and the elbow is bent with a spring.

5 The ground is not slotted, the tube must be fixed, and it must be beautiful.

6 Wall walkers prohibit ramps and must be horizontal and vertical (including water supply)

3. Pipe threading and wiring, and panel installation:

1 The joint is forbidden in the wire and the joint should be in the junction box. It is forbidden to take a tube with strong or weak electricity.

2 The wire must be separated: red is the fire line, blue or green is the zero line, the two colors are the ground line, and the white is the control line.

3 The wire should not be less than 15 cm in the switch box or socket box. It should be wound into a ring and placed at the bottom of the box. The wire is wrapped and covered with a protective film.

4 The ground wire and the common wire should pass through the box without cutting, and there should be some room for it.

5 Air-conditioning, water heaters, kitchens, Yuba and other high-power appliances, need to take the line that can be loaded.

6 The wire connector inside the cassette must be wrapped with a waterproof tape first, and the outside is wrapped with an insulating tape.

7 Performed with the electrical load reference standard.

8 The length of wire retention in the distribution box is not less than the half-length of the distribution box.

9 The bottom margin of the distribution box should be no less than 1.5 meters. The name of the power circuit should be indicated on the distribution box.

10 The door of the door switch box is 1.2 meters to 1.4 meters from the ground. The same horizontal line is not allowed to differ by ≤ 1mm.

â–³ The lamp switch is not allowed to be connected in series on the zero line, and the live line must be connected in series.

â–³ switch, socket panel installation must be straight, firm, not allowed to loose, must have a bottom box, not allowed to be directly mounted on the wood board.

â–³ Where the socket must be in the face-to-face direction, the left zero is right fire, the three holes are plugged into the grounding wire, and the copper wire is not allowed to be exposed more than 1mm in the box.

â–³ The switch should be easy to use after installation. The same indoor switch must be on the same horizontal plane and arranged in the most common and rarely used order.

â–³ The switch socket is not allowed to be pressed on the tile waist line and tile.

4. Installation regulations for lamps:

1 Each single branch circuit is not allowed to exceed 25 lamp heads, except for lanterns and lanterns. Under normal circumstances, it is strictly prohibited to exceed 10A.

2 Where the screw light must be the center point connected to the phase line, the zero line is connected to the screw terminal.

3 The mirror headlights are generally installed at a distance of about 1.8 meters from the ground, but must communicate well with the customer.

6 The embedded luminaires are fixed on the special cabinet frame, and the wires should have room in the lamp box for easy maintenance and disassembly.

7 The luminaire and the frame should be placed close to the light barrier and completely cover the light hole. No exposure is allowed.

8 The frame of the rectangular luminaire should be parallel to the decorative line of the top grid, and the deviation is ≤5mm.

9 The T4-shaped fluorescent tubes in the light trough should not be too long, causing a shadow between light and light.

5. Circuit switches and sockets, electricians and owners carefully determine the chalk mark, the socket should not be less, pay attention to the sliding door cover, the switch should be convenient and reasonable, the wire can not be directly buried in the wall.

6. After re-arranging the modified circuit, it is necessary to use the circuit layout diagram to distinguish the direction of the strong and weak electricity.

7. After the electric pipeline is laid, the circuit is shaken by a megohmmeter.

Second, circuit acceptance

(1) All kinds of electrical material brands should meet the design and owner requirements.

(2) The total and branch leakage protectors shall be within the safe load range.

(3), strong electricity shunt should be clear: 1, hall air conditioning, 2, bedroom air conditioning, 3, general lighting, 4, ordinary socket, 5, kitchen outlets, 6, bathroom outlets, 7, water heaters

(4) The TV has a wall-mounted threading tube that needs to be pre-embedded Ф40, and the lower end of the tube needs to be hidden in the cassette.

(5), the line is in place:

1, each function socket should be placed in place, and the number should be sufficient

2, the TV line is in place (hall, bedroom, study)

3. The satellite line is in place (hall, bedroom, study)

4, the network cable is in place (hall, each bedroom, study)

5, the telephone line is in place (hall, each bedroom, study, bathroom)

6, the sound line in place (sofa background wall, aisle, bathroom)

7, strong and weak wires should be divided into boxes

8. The wire tube needs to be fastened with a buckle every 1.5M, and the corners need to be fixed with fixing parts.

9. The phase line, neutral line and ground line of the socket must be separated, the ground line is yellow-green two-color line, and the zero line is blue line.

10. The cassettes side by side at the same position should be horizontal, the gaps should be consistent, the horizontal deviation should be no more than 2MM, and the gap deviation should be no more than 1MM.

11, air conditioning, water heaters, kitchen line application 2.5--4mm2 line.

12. The distance between the strong electric wire and the gas pipe should be greater than 300mm, and the cross distance should be greater than 100mm.

13. Under the special requirements, the bottom edge of the ordinary socket is 300mm. The bottom edge of the switch panel is 1400mm from the ground and 150mm from the side of the door sleeve.

14. There shall be no joints in the threaded pipe, and all wire joints shall be connected in the pass box.

15. A bridge connection is applied between the wires between the cassette and the cassette.

16. The subsequent backup construction power supply should be reserved for safe use of electricity.

17. When the grounding pipe is connected, the pipe joint should be glued or wrapped with waterproof tape.

18, the bathroom equipotential system should be connected.

19. The wires in the ceiling should be metal hose or PVC pipe, and all wires should not be exposed.

20, hydropower completion drawings need to include water, lighting, strong electrical outlets, weak electricity and other four pictures, digital photos or a DV.

21. Each double control switch (bedroom, aisle, hall, etc.) should be in place and convenient to use.

22. The reserved length of the wires in all sockets should be greater than 15CM.

23, the single-ply pipeline length is greater than 15M or there are two right-angle bends should be added cable box.

24. There should be no more than 4 socket lines in the Φ16, and no more than 6 control lines.

25. There should be no more than 6 socket lines in the Φ20 line, and no more than 8 control lines.

26, each bathroom Yuba should reserve pipes and control lines.

27, the pipeline crossing should be laid in accordance with the principle of the water pipe under the line and the line pipe.

28. The length of the “yellow wax tube” on the concrete should be greater than 10 cm.

29. The depth of the pre-buried hard pipeline is not less than 2CM, and the straight groove needs to be roughened.

30, bathroom Yuba exhaust vents need to be reserved. Do not take holes below 5cm on the bottom edge of the beam.

31. The maximum number of single-tube threading of the lighting switch control line cannot exceed 8.

32. The distance between the socket and the water head shall not be less than 10cm, and the socket shall not be directly below the water head.

33. The newly connected circuit in the distribution box shall not be directly connected to the power supply to avoid potential safety hazards during subsequent construction.

15.6 Inch POS

The POS Machine reads the cardholder's magnetic stripe information on the bank card through the card reader, the POS operator enters the transaction amount, the cardholder enters the personal identification information (ie password), and the POS sends this information through the UnionPay Center and uploads it. The card issuing bank system completes the online transaction, gives information on whether it is successful or not, and prints the corresponding bill. The application of POS realizes the online consumption of credit cards, debit cards and other bank cards, ensures the safety, speed and accuracy of transactions, avoids complicated labor such as manual inquiry of blacklists and pressing orders, and improves work efficiency.

15.6 Inch Pos,Pos Billing Machine For Retail Shop,Mini Pos Machine,Touch Pos Machine

ShengXiaoBang(GZ) Material Union Technology Co.Ltd , https://www.sxbgz.com